Hi everybody!
I have a question that maybe doesn´t have answer...
Is it possible to predict any result in trnsys?
I have the demand of a building (a profile) and I want to satisfy this
demand using a fixed producer (could be microcogeneration) with a deposit to
storage energy not used and make use of it when there is demand. What I´d
need to know is if there is any strategy to know the size of this fixed
producer (for example...5-10-15 kW....) if I limit the size of the storage
(for example....5-10-15 kW....) or viceversa, with a fixed producer if I
could know the optimal size of the storage, I mean without studying the
whole simulation, without simulating and analyzing the evolution of the
plot. I want to know if there is any relationship between these factors
(profile load, fixed producer and size storage).
Any answer will be welcome!
Thanks!
Best regards,
Maria
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/trnsys-users-onebuilding.org/attachments/20101110/745eaff4/attachment-0001.htm>
More information about the TRNSYS-users
mailing list