<div>I have a question that maybe doesnŽt have answer...</div>
<div> </div>
<div>Is it possible to predict any result in trnsys?</div>
<div> </div>
<div>I have the demand of a building (a profile) and I want to satisfy this demand using a fixed producer (could be microcogeneration) with a deposit to storage energy not used and make use of it when there is demand. What IŽd need to know is if there is any strategy to know the size of this fixed producer (for example...5-10-15 kW....) if I limit the size of the storage (for example....5-10-15 kW....) or viceversa, with a fixed producer if I could know the optimal size of the storage, I mean without studying the whole simulation, without simulating and analyzing the evolution of the plot. I want to know if there is any relationship between these factors (profile load, fixed producer and size storage).</div>

<div> </div>
<div>Any answer will be welcome!</div>
<div> </div>
<div>Thanks!</div>
<div> </div>
<div>Best regards,</div>
<div> </div>
<div>Maria</div>