[TRNSYS-users] Ventilation VS cooling & heating
Chou Shen
csz59 at mst.edu
Sun Dec 18 03:12:46 PST 2011
Hi
Thanks to David and Matt, you messages have helped me a lot. Now I know how
to use type 24 & 25 to get monthly summary.
At this time I have some other questions:
1. When Editing type 56, in the Ventilation lable, the Heating and Cooling
option can be set up by defining airchange rate and temperature & RH of air
flow; while in both the Cooling lable and Heating lable, the cooling and
heating option can be set up by defining cooling / heating power (does that
mean I need to estimate the cooling / heating load before set this block
up?), and the setpoint temperature & RH. As a result, type 56 provides two
methods to define HVAC system. What's the relationships between the two
methods?.
2. In addition to adding the information of HVAC in type 56, do I need to
creat the HVAC system in to get the information of energy consumption of
HVAC system?
Thanks!
--
Chou Shen
Graduate Research Assistant
Department of Civil, Architectural & Environmental Engineering
Missouri University of Science and Technology
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/trnsys-users-onebuilding.org/attachments/20111218/02c5c6cb/attachment-0005.htm>
More information about the TRNSYS-users
mailing list