Hello fellow Doe-2 users,

I am working on an ASHRAE baseline model for a Standard office building
with System 8 (VAV with PFP boxes). I have a fundamental question regarding
the building peak loads (SS-D) report not matching with the total of all
the System Design reports (SV-A). My total capacity as per SV-A for the
whole building is 524 tons, whereas SS-D reports only 275 tons. My question
is what is causing such a huge difference between the coil loads and the
final system capacity? I cant understand what load is the SV-A considering
beyond what shown in SS-D? I have auto-sized the cooling at 1.15 as per
ASHRAE baseline but this doesn't explain the discrepancy? Please find
attached the .inp, .pd2  and TMY3 files.

 Can any fellow DOE-2 users help me with this?

Thanks
*Sriranjani Ramachandran*
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20170208/3bde6d7d/attachment-0004.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: ASH_Baseline_Sys8.zip
Type: application/zip
Size: 107966 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20170208/3bde6d7d/attachment-0005.zip>


More information about the Equest-users mailing list