<div dir="ltr">Hello fellow Doe-2 users,<div><br></div><div>I am working on an ASHRAE baseline model for a Standard office building with System 8 (VAV with PFP boxes). I have a fundamental question regarding the building peak loads (SS-D) report not matching with the total of all the System Design reports (SV-A). My total capacity as per SV-A for the whole building is 524 tons, whereas SS-D reports only 275 tons. My question is what is causing such a huge difference between the coil loads and the final system capacity? I cant understand what load is the SV-A considering beyond what shown in SS-D? I have auto-sized the cooling at 1.15 as per ASHRAE baseline but this doesn't explain the discrepancy? Please find attached the .inp, .pd2  and TMY3 files. </div><div><br></div><div> Can any fellow DOE-2 users help me with this?</div><div><br></div><div>Thanks</div><div><div class="gmail_signature"><div dir="ltr"><div><b><font color="#0b5394">Sriranjani Ramachandran</font></b></div><div><br></div><div><p><br></p></div></div></div>
</div></div>