[TRNSYS-users] TRNSYS-users Digest, Vol 76, Issue 38

WALID KADRI walidenergetique at gmail.com
Sat May 7 14:58:39 PDT 2011


Thank you, thank you very much.
I'm preparing my memoiry of master i'm special in mechanic engeneering of
thermal power, my memoiry is about ISCC integrated solai combine cycle
systeme, if you have in exemple projet in transys about this send it please
to study it.

2011/4/11 <trnsys-users-request at cae.wisc.edu>

> Send TRNSYS-users mailing list submissions to
>        trnsys-users at cae.wisc.edu
>
> To subscribe or unsubscribe via the World Wide Web, visit
>        https://mailman.cae.wisc.edu/listinfo/trnsys-users
> or, via email, send a message with subject or body 'help' to
>        trnsys-users-request at cae.wisc.edu
>
> You can reach the person managing the list at
>        trnsys-users-owner at cae.wisc.edu
>
> When replying, please edit your Subject line so it is more specific
> than "Re: Contents of TRNSYS-users digest..."
>
> Today's Topics:
>
>   1. Re: time delay by means of type 93 (input value recall)
>      (Matt Duffy)
>
>
> ---------- Message transféré ----------
> From: "Matt Duffy" <duffy at tess-inc.com>
> To: "Stefan Wachter" <wachter at mail.hs-ulm.de>, trnsys-users at cae.wisc.edu
> Date: Mon, 11 Apr 2011 15:35:35 -0500 (CDT)
> Subject: Re: [TRNSYS-users] time delay by means of type 93 (input value
> recall)
>
> Hello Stefan,
>
> As long as you implement the timestep as a fraction in an EQUATIONS in the
> control cards, you should be ok. For example,
>
> EQUATIONS 1
> TIMESTEP=2/60 !Timestep of 2 mins
>
> Please see the attached for reference.
>
>
> Best regards,
>
> Matt Duffy
>
>
> *----- Original Message -----*
> *From:* "Stefan Wachter" <wachter at mail.hs-ulm.de>
> *Sent:* Fri, April 8, 2011 4:05
> *Subject:* [TRNSYS-users] time delay by means of type 93 (input value
> recall)
>
>     Hello everybody,
>
> I am new at trnsys-users.
> Currently I`m modeling an already existing solar heating system (for hot
> water).
> In this system the loading pump is activated by a time delay of 4 minutes
> (after solar pump is launched).
> I tried to model this as follows:
>
> - simulation time step: 2 minutes
> - storage of the control signal of the solar pump over the last two time
> steps by means of type 93 (input value recall)
> - if the control signal of the solar pump is "1" in the stored two time
> steps, then the loading pump is launched.
>
> It works (tried by a simple example deck) but does it also works in
> context with a quite big deck (120 m² apertur area, 2 continuous
> controllers)?
> I`m concerned about that the small time step of 2 minutes could cause
> problems (for example oscillations of the controllers).
> Could this work or have someone of you another idea how i can solve this
> problem?
>
> Thanks a lot.
> Best regards.
>
> Stefan Wachter
>
>
>
>  ------------------------------
>
> _______________________________________________
> TRNSYS-users mailing listTRNSYS-users at cae.wisc.eduhttps://mailman.cae.wisc.edu/listinfo/trnsys-users
>
>
> _______________________________________________
> TRNSYS-users mailing list
> TRNSYS-users at cae.wisc.edu
> https://mailman.cae.wisc.edu/listinfo/trnsys-users
>
>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/trnsys-users-onebuilding.org/attachments/20110507/dba00f5c/attachment-0005.htm>


More information about the TRNSYS-users mailing list