I have been letting eQUEST determine baseline equipment capacities using
the weather files selected by the wizard, rather than creating 99.6%/1%
design days as allowed by G3.1.2.2.1. Does anyone recommend using design
days for LEED/Appendix G baselines? If so, how do you determine
DRYBULB-RANGE, or do you set it to zero to run the same DRYBULB-HIGH
temperature 24/7/365? Does the design day method typically maximize
baseline energy consumption compared to TMY/TMY2 weather files?
Thanks,
Bill
William Bishop, PE, BEMP, LEED(r) AP | Pathfinder Engineers & Architects
LLP
Mechanical Engineer
134 South Fitzhugh Street Rochester, NY 14608
T: (585) 325-6004 Ext. 114 F: (585) 325-6005
wbishop at pathfinder-ea.com www.pathfinder-ea.com
<http://www.pathfinder-ea.com/>
P Sustainability - the forest AND the trees. P
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110112/9e45837d/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/jpeg
Size: 2412 bytes
Desc: image001.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110112/9e45837d/attachment.jpeg>
More information about the Equest-users
mailing list