[Equest-users] 4-Pipe Fan Coil vs. VAV
Edward Kucirek
kucirekengineering at hotmail.com
Fri Feb 4 10:25:06 PST 2011
I am running a simulation to compare various systems. When I run the
4-pipe fan coil and I look at SS-D I get a building load for heating and
cooling with what it should be but when I use the same building and
change the system to Standard VAV with HW and CW the building cooling
load is 20% higher and the building heating load is 65% higher. Does
anyone have any suggestions as why this would be happening?
Kevin Hupf, LEED AP
Kucirek Engineering, Inc.
7587 Main St.
Omaha, NE 68127
Ph: (402)951-0022
Fax: (402)951-0023
kucirekengineering at hotmail.com
www.kucirekengineering.com