[Equest-users] District heating

David Eldridge dse at grummanbutkus.com
Thu Oct 21 08:10:44 PDT 2010


There is a newer version of this document:



http://www.usgbc.org/ShowFile.aspx?DocumentID=7671



A streamlined path is offered, although it may not capture the most credit
due to the project as there is a points cap.



David

 *
*



*David S. Eldridge, Jr.**, P**.**E**.**, LEED AP BD+C, BEMP, HBDP*

Project Manager



Direct: (847) 316-9224 | Fax: (847) 328-4550

http://www.grummanbutkus.com



*Grumman/Butkus Associates* | 820 Davis Street, Suite 300 | Evanston, IL
60201

Energy Efficiency Consultants and Sustainable Design Engineers

*
*



*From:* equest-users-bounces at lists.onebuilding.org [mailto:
equest-users-bounces at lists.onebuilding.org] *On Behalf Of *TOPP - Per Topp
*Sent:* Thursday, October 21, 2010 10:02 AM
*To:* equest-users at lists.onebuilding.org
*Subject:* [Equest-users] District heating



Hi



Do anyone know if district still has to be calculated according to the
attached pdf-file?



This means that it is necessary  to do a step1 and step 2 model for both the
baseline design model and the proposed design model.



Or can district heating be calculated as purchased heat as suggested in
G.3.1.1.1 and how is this then done without modeling a boiler in the
baseline model?



Med venlig hilsen

*Per Topp
*Senior Projektingeniør
Installation, El & VVS (Ballerup)

Tlf. dir: +45 44 85 87 09
Mobil:  +45 61 55 60 15
TOPP at orbicon.dk

*Orbicon | Leif Hansen A/S
*Lautrupvang 4B, 2750 Ballerup
Tlf. +45 44 85 86 87 Fax +45 44 85 86 78

Tilmeld dig vores
nyhedsbreve<http://www.orbicon.dk/.1239.aspx?utm_source=nyhedsbrev&utm_medium=mail>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20101021/4d53c8c1/attachment.htm>


More information about the Equest-users mailing list