Dear all,
I'm currently working for a R&D center on District Heating and Cooling
system supplying 90c hot water, which is mandatory in the area. No way to
change to other chiller or system.
It easily meets EAp2 requirements on heating compared to baseline but fails
to meet for cooling compared baseline (electrical centrifugal chiller)
We have set up the baseline based on ASHRAE Appendix G assuming electrical
one for cooling on the baseline.
I wonder if there are any exceptional ways to solve this problem. (i.e.
baseline with other district cooling system).
COP of absortion chiller of design building is of course much lower than
baseline(electric) but cost of hot water is not low enough to compensate
this COP gap.
thank you in advance for sharing your ideas on this.
any similar cases
any way to be exempted from USGBC
best regards,
Seyong Choi 최 세 용 |
LEED GA, Business Developer
Industry & Facilities division
Bureau Veritas Korea
Rm 1102, Keungil Tower, 677-25,
Yeoksam-dong, Kangnam-gu, Seoul
Tel: +82 2 555 8871 Fax: +82 2 555 8940
M.P: +82 11 9558 6346
www.bureauveritas.co.kr
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20100829/09e4cabe/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: ecblank.gif
Type: image/gif
Size: 45 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20100829/09e4cabe/attachment.gif>
More information about the Bldg-sim
mailing list