[bldg-sim] CHP energy cost summary

Peter Simmonds peter.simmonds at ibece.net
Mon Jan 17 12:18:03 PST 2005


Does anyone have any experience with utility rate applications for
electricity? We are simulating the cost comparison of building having a
traditional chilled water plant and boilers against a plant having three
cogeneration units providing heat for an absorption chiller. The results
shown in report ES-E do not match report ES-F. The total charges should
be the same or am I missing something?

 

Peter Simmonds Ph.D.

Associate
IBE Consulting Engineers

14130 Riverside Drive Suite 201

Sherman Oaks, CA 91423
p:   (818) 377-8220
f:    (818) 377-8230
m:  (818) 219-1284
IDEAS FOR THE BUILT ENVIRONMENT <BLOCKED::http://www.ibece.com/> 

This e-mail message, including any attachments, is for the sole use of
the intended recipient(s) and may contain confidential and privileged
information. Any unauthorized review, use, disclosure, or distribution
is prohibited. If you are not the intended recipient, please contact the
sender by reply e-mail and destroy all copies of the original message.

 



===========================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20050117/af68c59a/attachment.htm>


More information about the Bldg-sim mailing list