I am modeling a dormitory for EAc1 in version 3.60. I've calculated the
peak DHW load by using the flow rate of all of the fixtures on the hot
water loop (410 gpm). I have a schedule that accounts for the vacant
periods during the breaks and reduced usage in the summer when the
building is partially occupied. When I use the 410 gpm rate as the
process flow the energy consumption for hot water is astronomically
high. 

 

What fact do I need to apply to the calculated flow rate to get
realistic results?

 

Thanks

Tom Butler, LEED(r) AP
Direct Phone 404-253-1435 | Direct Fax 404-253-1335 

LORD, AECK & SARGENT ARCHITECTURE
Responsive Design * Technological Expertise * Exceptional Service 

 

www.lordaecksargent.com

 

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20090819/1d9cebba/attachment.htm>


More information about the Equest-users mailing list