I am modeling a VAV system for a LEED Project per Appendix G. There are
several control requirements for the boiler, chiller and air distribution
system that I am having trouble implementing in Trace:
Per ASHRAE 90.1 2004 Appendix G G3.1.3.3: Specifying the boiler supply and
return temperatures
Per ASHRAE 90.1 2004 Appendix G G3.1.3.4: Boiler supply temperature reset
based on OA temperature
Per ASHRAE 90.1 2004 Appendix G G3.1.3.8: Specifiying the chiller supply and
return temperatures
Per ASHRAE 90.1 2004 Appendix G G3.1.3.9: Chilled water supply temperature
reset based on OA temperature
Per ASHRAE 90.1 2004 Appendix G G3.1.3.12: Supply air temperature reset
based on zone demand
Anyone have luck implementing these control strategies in Trane Trace?
Thanks,
-Jon
======================================================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
More information about the Bldg-sim
mailing list