<div dir="ltr">Dear TRNSYS users,<div>I have a couple of questions so I sent some screenshots related to my study. First of all, you can see my general system on the interface, I designed a greenhouse on trnbuild, I entered its layers etc. I will connect a heat pump to it, and then a hybrid energy system will be used according to the energy needs.<br>In the Inputs section, I wrote the inputs such as the temperature, humidity, etc. required for the heat pump.<br>1.) In the Schedules section, I defined the hours worked in the greenhouse and the number of employees, but for example, 25 people work in the greenhouse, I could show it as a coefficient of 1, how can I indicate that there are 25 people?</div><div>2.) Since there are two main zones in the ventilation sections, one of which is the greenhouse production area and one is an outbuilding (I defined a steel with a low coefficient in between, because there is no wall), ventzone 1 2 and mech were assigned as default. I haven't considered these, but should I? I added the natural ventilation section on top of it, and for this, as far as I understand I need to create a correlation with schedules but what kind of way should I follow? For natural ventilation, normal ventilation will be done from outside.</div><div>3.) For mechanical ventilation, heating and cooling, a heat pump will be used. In this, I connected the type 922c that I used in the interface, I chose the input from the building and trnbuild section, but I think I need to define a different correlation, I've reviewed the manual on this subject, but I couldn't see anything clear about the answer to my question. What can I do about it? <br>Best regards,</div><div>Zeynep</div></div>