<div dir="ltr"><div class="gmail_default" style="font-family:tahoma,sans-serif;color:rgb(0,0,0)">​Dear Trnsys-experts,</div><div class="gmail_default" style="font-family:tahoma,sans-serif;color:rgb(0,0,0)"><br></div><div class="gmail_default" style="font-family:tahoma,sans-serif;color:rgb(0,0,0)">Would anyone happen to have an experience on advanced building modeling with basements included? I am trying to model a building in TRNSYS 17 using type 56. My building includes three basements as shown in figure below.</div><div class="gmail_default" style="font-family:tahoma,sans-serif;color:rgb(0,0,0)"><br></div><div class="gmail_default" style="font-family:tahoma,sans-serif;color:rgb(0,0,0)"><img src="cid:ii_iv42un0s2_15830772370a4047" width="254" height="199"><br>​I am wondering if what I have done puts me in the right path, to know: I used Type 77 to model a simple ground temperature, then the output (soil temperature at Node) has been connected to TBOUNDARY. In fact, I have set three Nodes in type 77 (one node for each basement) and the walls's boundary conditions of the basements are = 1*TBOUNDARY.</div><div class="gmail_default" style="font-family:tahoma,sans-serif;color:rgb(0,0,0)"><br></div><div class="gmail_default" style="font-family:tahoma,sans-serif;color:rgb(0,0,0)">Thanks in advance</div><div class="gmail_default" style="font-family:tahoma,sans-serif;color:rgb(0,0,0)"><br></div><div class="gmail_default" style="font-family:tahoma,sans-serif;color:rgb(0,0,0)">Regards,</div><div class="gmail_default" style="font-family:tahoma,sans-serif;color:rgb(0,0,0)">Ismail</div><img width="0" height="0" class="mailtrack-img" src="https://mailtrack.io/trace/mail/37b4ba31f36073f45030afbe969d5e664a6c9571.png?u=633613"></div>