<div dir="ltr"><div>Dear users,</div><div> </div><div> I am trying to run a 10 year simulation</div><div> </div><div>I have copied my weather data in the weather data file 10 times in a row. So my weather file should provide data for a ten year period. Still my simulation stops every time at 73273 hrs and gives error message (4 errors were found in the deck).</div><div> </div><div>is there a maximum length of TRNSYS simulation?</div><div> </div><div>If there is, is there any other way to run 10 sequential one year simulations (and change one parameter every time)?</div><div> </div><div>regards,</div><div> </div><div>Santeri Siren</div></div>