<html>
<head>
<style><!--
.hmmessage P
{
margin:0px;
padding:0px
}
body.hmmessage
{
font-size: 12pt;
font-family:Calibri
}
--></style></head>
<body class='hmmessage'><div dir='ltr'><br>Dear Santeri,<br><br>You do not need to repeat copy paste the weather file for 10 times.<br><br>Just delete the last row (8760th hour) of your weather file, so that the total row number will be 8760 instead of 8761 (8761 because of the "0"-8760 hour).<br><br>Kind Regards,<br>Sunliang Cao  <br><br><br><br><div><hr id="stopSpelling">Date: Mon, 3 Nov 2014 15:47:46 +0200<br>From: santeri.siren.laatikko@gmail.com<br>To: trnsys-users@cae.wisc.edu<br>Subject: [TRNSYS-users] maximum length of simulation?<br><br><div dir="ltr"><div>Dear users,</div><div> </div><div> I am trying to run a 10 year simulation</div><div> </div><div>I have copied my weather data in the weather data file 10 times in a row. So my weather file should provide data for a ten year period. Still my simulation stops every time at 73273 hrs and gives error message (4 errors were found in the deck).</div><div> </div><div>is there a maximum length of TRNSYS simulation?</div><div> </div><div>If there is, is there any other way to run 10 sequential one year simulations (and change one parameter every time)?</div><div> </div><div>regards,</div><div> </div><div>Santeri Siren</div></div>
<br>_______________________________________________
TRNSYS-users mailing list
TRNSYS-users@lists.onebuilding.org
http://lists.onebuilding.org/listinfo.cgi/trnsys-users-onebuilding.org</div>                                        </div></body>
</html>