<div dir="ltr"><div><div>dear all <br></div>i am simulating a five zone building, air conditioning by a packaged A.c,operated by photovoltaic. the temperature of all zones are well maintained in the  desired schedule but my problem is that the output of PV has two option 1. Array power 2. Power at maximum power point tracker <br>
</div><div>here the array power is all times given as ZERO while power at MPPT has value but i think in real that may not used . <br></div><div>any one can help why this problem occurs i am attaching the model <br><br></div>
<div>regards <br><br></div><div>B.L.Gupta <br></div><div><br></div></div>