    <div class="moz-cite-prefix">Hello Mike<br>
      <br>
      I had the same problem. The reviewer asked me why I got electric
      consumption for a gas boiler. In the reply I explained him about
      the interlock component and it was fine.<br>
      After that question I always  deleted the interlock component so I
      don´t get any comments on that. I don´t think is a good idea to
      put them as process load because its part of the hot water system.<br>
      <br>
      On 22/08/2014 05:00 p.m., Mike Oliva wrote:<br>
    </div>
    <blockquote
cite="mid:CAGvpDANTK-Nc5EP2q3PMGOSOMc2pzSCX=vor9TiEqJxsg1e-Kg@mail.gmail.com"
      type="cite">
      <div dir="ltr">
        <div>
          <div>I'm modeling for LEED and trying to make sure I have
            everything accounted for w/ in the requirements and for
            submitting to LEED online but I think I have an issue with
            the way TRACE applies these energy riders of the control
            panel & interlocks to some plants (90.1 boiler =
            0.5kw).  For one, the energy use is applied to electrical
            space heating component even if Gas (ex. boiler) and LEED
            does not allow electrical space heating use for fossil fuel
            heating source, so I extract that energy use to define as
            process energy. I have a boiler in both cases so both are
            modeled with the same rider (0.5kw).  <br>
            <br>
            The next issue I come up w/ since I've pulled out that
            electrical as process is that the proposed boiler runs for
            much fewer hours than the baseline so even tho the control
            panel interlock energy use is the same for each, the
            difference in run time causes the baseline to be quite a bit
            more.  <br>
            <br>
          </div>
          Curious what folks are doing in this situation, or has it ever
          come up?  are you creating copies of all the Trace 90.1 plants
          and removing the control panel & interlock component?  <br>
          <br>
        </div>
        Thanks,<br>
        Mike<br>
      </div>
      <br>
      <fieldset class="mimeAttachmentHeader"></fieldset>
      <br>
      <pre wrap="">_______________________________________________
Trace-users mailing list
<a class="moz-txt-link-freetext" href="http://lists.onebuilding.org/listinfo.cgi/trace-users-onebuilding.org">http://lists.onebuilding.org/listinfo.cgi/trace-users-onebuilding.org</a>
To unsubscribe from this mailing list send  a blank message to <a class="moz-txt-link-abbreviated" href="mailto:TRACE-USERS-UNSUBSCRIBE@ONEBUILDING.ORG">TRACE-USERS-UNSUBSCRIBE@ONEBUILDING.ORG</a>
</pre>
    </blockquote>
    <br>
  </body>
</html>