Hi. I am modelling a VAV systems in base line and proposed models for LEED certification purpose. Even though I followed the Trace 700 user manual steps for introducing 62.1 air flows I don't get the same Nom Vent in the system check sums report for the baseline and proposed system?. Thanks --