<div dir="ltr">Hi everyone,<div><br></div><div>I encountered following warning
for multiple zones
in an energy model:</div><div><br></div><div> <b> Zone: EL2Core Zn (G.C19) could not successfully<br> allocate all equipment energy to the 5-minute bins<br> because of an equipment overload. The peak load<br> used in ECONOMICS will not include the fraction due<br> to the overload, but the PLANT reports will.<br> Mon/Day/Hour: 1 1 10 Energy: 1.4 Unallocated: 0.707 </b></div><div><b><br></b></div><div>Can this be ignored or will it have impact on energy consumption? Kindly reply with the solution if anyone else has encountered this warning and successfully removed it.</div><div><br></div><div>Regards.</div><div>Rushi.</div></div>