<div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><font color="#073763">Hi Konstantina,</font></div><div dir="ltr"><font color="#073763"><br></font></div><div dir="ltr"><font color="#073763">To model the System type-8 you are required to have the system as VAV but not power induction unit as per me.</font></div><div dir="ltr"><font color="#073763"><br>The system that you are required to take in the baseline case is Variable Air Volume in the system type which is as follows:</font></div><div dir="ltr"><font color="#073763"><br></font></div><div dir="ltr"><div><font color="#073763"><img src="cid:ii_jyo1bpkq3" alt="image.png" width="511" height="323"><br></font></div><div><font color="#073763"><br></font></div><div><font color="#073763">In the heating tab you are correct as per seen.</font></div><div><font color="#073763">The thing that System type-8 has is that it has both heating as well reheat that is provided as zone heat source or zone reheat.</font></div><div><font color="#073763"><br></font></div><div><div><font color="#073763"><img src="cid:ii_jyo1g2e14" alt="image.png" width="474" height="317"><br></font></div></div><div><font color="#073763"><br></font></div><div><font color="#073763">In the Humidity Control you shall have to have the control as per the space likewise the proposed case or as per reference guide norms. A typical example is given as follows:</font></div><div><font color="#073763"><br></font></div><div><font color="#073763"><br></font></div><div><div><font color="#073763"><img src="cid:ii_jyo1ng3n5" alt="image.png" width="335" height="182"><br></font></div></div><div><font color="#073763"><br></font></div><div><font color="#073763"><br></font></div><div><font color="#073763">Hope this might clear your understanding.</font></div><div><font color="#073763"><br></font></div><div><font color="#073763"><br></font></div><div><font color="#073763"><b>Thanks,</b></font></div><div><font color="#073763">Sharad. Kumar</font></div><div><font color="#073763">Freelancer</font></div><div><font color="#073763">India.</font></div><div><br></div>---------- Forwarded message ----------<br>From: Konstantina Kalliakoudi <<a href="mailto:kalliakoudi.k@gmail.com" target="_blank">kalliakoudi.k@gmail.com</a>><br>To: <a href="mailto:equest-users@lists.onebuilding.org" target="_blank">equest-users@lists.onebuilding.org</a><br>Cc: <br>Bcc: <br>Date: Fri, 26 Jul 2019 17:40:22 +0300<br>Subject: [Equest-users] Modeling Ashraes Baseline building in equest for LEED - 3 questions<br><div dir="ltr"><div dir="ltr">Dear equest experts,<div>I have following issue.</div><div>Accorting  ASHRAE 90.1.2010 table G3.1.1A my baseline building is following:</div><div><br></div><div>System 8-VAV with PFP Boxes</div><div><br></div><div>More specific according table G3.1.1B. The system is</div><div>VAV with Parallel rooftop VAV with reheat, Fan control VAV, Cooling type Chilled Water, Heating type electric resistance.</div><div><br></div><div>1) To model this system in equest I have choosen PIU system in equest (see following screenshot)</div><div><br></div><div><img src="cid:ii_jyk7hn340" alt="image.png" width="542" height="453"><br></div><div><br></div><div>2) In the heating table I have completed as following</div><div><br></div><div><img src="cid:ii_jyk7l3q11" alt="image.png" width="542" height="352"><br></div><div><br></div><div>Do you find these choice correct?</div><div>Do you have any suggestions?</div><div><br></div><div>3) How shall I treat the humidity control in the baseline building ? Is it the same with proposed building?</div><div><br></div><div><img src="cid:ii_jyk7o2x52" alt="image.png" width="368" height="200"><br></div><div><br></div><div>Thank you very much.</div><div>The answers I get from this forum are always helpful.</div><div><br></div><div>Best regards</div><div><br></div><div><div style="color:rgb(136,136,136)">Konstantina Kalliakoudi</div><div style="color:rgb(136,136,136)">Mechanical Engineer Μ.Sc.</div><div style="color:rgb(136,136,136)"><a href="http://www.khmoe.gr/" target="_blank">www.khmoe.gr</a></div></div></div></div></div><div class="gmail_quote"><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><br>
</blockquote></div></div></div></div>