<div dir="ltr"><div dir="ltr">Dear equest experts,<div>I have following issue.</div><div>Accorting  ASHRAE 90.1.2010 table G3.1.1A my baseline building is following:</div><div><br></div><div>System 8-VAV with PFP Boxes</div><div><br></div><div>More specific according table G3.1.1B. The system is</div><div>VAV with Parallel rooftop VAV with reheat, Fan control VAV, Cooling type Chilled Water, Heating type electric resistance.</div><div><br></div><div>1) To model this system in equest I have choosen PIU system in equest (see following screenshot)</div><div><br></div><div><div><img src="cid:ii_jyk7hn340" alt="image.png" width="542" height="453"><br></div></div><div><br></div><div>2) In the heating table I have completed as following</div><div><br></div><div><div><img src="cid:ii_jyk7l3q11" alt="image.png" width="542" height="352"><br></div></div><div><br></div><div>Do you find these choice correct?</div><div>Do you have any suggestions?</div><div><br></div><div>3) How shall I treat the humidity control in the baseline building ? Is it the same with proposed building?</div><div><br></div><div><div><img src="cid:ii_jyk7o2x52" alt="image.png" width="368" height="200"><br></div></div><div><br></div><div>Thank you very much.</div><div>The answers I get from this forum are always helpful.</div><div><br></div><div>Best regards</div><div><br></div><div><div style="color:rgb(136,136,136)">Konstantina Kalliakoudi</div><div style="color:rgb(136,136,136)">Mechanical Engineer Μ.Sc.</div><div style="color:rgb(136,136,136)"><a href="http://www.khmoe.gr/" target="_blank">www.khmoe.gr</a></div></div><div><br></div><div><br></div><div><br></div></div></div>