<div dir="ltr"><div dir="ltr">Dear all,<div><br></div><div>I am working on a residential project in which the indoor units fan is cycling with load. For this, I have modelled as PSZ HP (as designed) and changed indoor fan mode from continuous to intermittent operation. My first question is whether it is correct to model intermittent for system with cycling or should I model different system. </div><div><br></div><div>Additionally, as per definition of intermittent operation : The indoor fan operates as in CONTINUOUS, but only for  that fraction of the hour required for space heating or cooling. I want to check how many hours it is cycling as I assumed that the eQUEST is working on hourly timestep. By extracting hourly report of fan cycle ON for continuous and intermittent operation, the hourly profiles are:</div><div><div><img src="cid:ii_ju2ocae20" alt="image.png" width="452" height="271"><br></div></div><div>From the figure, it appears that fan is running maximum 60% of an hour in intermittent operation whereas 100% in continuous. As it is providing results in sub-hourly basis, is it possible to create schedule to restrict cycle off on sub-hourly?</div><div><br></div><div>Thank you.</div><div><br></div><div>Regards,</div><div>Mayank Bhatnagar</div><div><br></div><div> </div></div></div>