<div dir="ltr"><div><font color="#073763">Hi Siddharth,</font></div><div><font color="#073763"><br></font></div><div><font color="#073763">For a solar PV panel calculation you will be required to fetch the solar PV total consumption for the whole year.</font></div><div><font color="#073763">You are then required to deduce the solar PV electrical output capacity in kWh by may be exceptional calculation  from the total yearly electrical consumption of the Proposed Case.</font></div><div><font color="#073763"><br></font></div><div><font color="#073763">For baseline case there is no need to add the solar PV consumption or even to alter the calculation.</font></div><div><font color="#073763"><br></font></div><div><font color="#073763">The deduced proposed case consumption shall be counted as the actual proposed case consumption after the solar PV installed capacity calculation.</font></div><div><font color="#073763"><br></font></div><div><font color="#073763">You can have a look at the solar PV calculation from my previous posts.</font></div><div><font color="#073763"><br></font></div><div><font color="#073763">The total yearly consumption from the solar PV can be obtained from the total Solar panel area, solar PV efficiency, total average solar insolation for the larger part of year then the number of days or time duration the solar PV can operate in an year.</font></div><div><font color="#073763">Might be helpful.</font></div><div><font color="#073763"><br></font></div><div><font color="#073763"><br></font></div><div><font color="#073763"><b>Thanks,</b></font></div><div><font color="#073763">Sharad.Kumar</font></div><div><font color="#073763">India.</font></div><div><font color="#073763"><br></font></div><div><br></div>---------- Forwarded message ----------<br>From: siddharth patil via Equest-users <<a href="mailto:equest-users@lists.onebuilding.org" target="_blank">equest-users@lists.<wbr>onebuilding.org</a>><br>To: <a href="mailto:equest-users@lists.onebuilding.org" target="_blank">equest-users@lists.<wbr>onebuilding.org</a><br>Cc: <br>Bcc: <br>Date: Thu, 27 Apr 2017 15:25:00 -0700<br>Subject: [Equest-users] (no subject)<br><div dir="ltr"><div>Hello, I am modeling PV system into my eQuest model. I want to run it over my baseline model and see how much savings I get. For this I am trying to set a global parameter or the command-keyword method for parametric run. How can I set a global parameter for Electric meter - Cogeneration - Track Mode parameter?</div><br>Thanks in advance!<div><br clear="all"><div><div class="m_-7045809289612100480gmail-m_-7112864313257115030gmail_signature"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr" style="color:rgb(33,33,33);font-family:wf_segoe-ui_normal,"segoe ui","segoe wp",tahoma,arial,sans-serif;font-size:15px"><b><u>Siddharth S. Patil</u></b></div><div dir="ltr" style="color:rgb(33,33,33);font-family:wf_segoe-ui_normal,"segoe ui","segoe wp",tahoma,arial,sans-serif;font-size:15px"><b><u><br></u></b></div><div dir="ltr" style="color:rgb(33,33,33);font-family:wf_segoe-ui_normal,"segoe ui","segoe wp",tahoma,arial,sans-serif;font-size:15px"><br></div></div></div></div></div></div></div></div></div></div></div></div></div>