<div dir="ltr"><div style="text-align:left"><span style="font-size:12.8px"><font color="#073763">Hi Saif,</font></span></div><div style="text-align:left"><span style="font-size:12.8px"><font color="#073763"><br></font></span></div><div style="text-align:left"><font color="#073763"><br></font></div><div style="text-align:left"><span style="font-size:12.8px"><font color="#073763">I will like to mention that PS-C is equipment load reports and PV-A is chiller plant design parameters based cooling capacity. So if there is some relation then there can be some connections in hours to be multiplied with the equipment loads to get the cooling capacity of the plant loads as the units are in MBtu and MBtuh.</font></span></div><div style="text-align:left"><span style="font-size:12.8px"><font color="#073763"><br></font></span></div><div style="text-align:left"><span style="font-size:12.8px"><font color="#073763"><br></font></span></div><div style="text-align:left"><span style="font-size:12.8px"><font color="#073763">But the real PV-A report analyses is like it is the auto-sized parameter based and with the input of flow and the temperature difference of cooling plant configuration based cooling capacity, the cooling capacity is determined. The formula can be 500 X GPM X delta T. GPM is the cooling plant water flow and delta T is loop design temperature difference. The default temperature difference is 10 °F.</font></span></div><div style="text-align:left"><span style="font-size:12.8px"><font color="#073763"><br></font></span></div><div style="text-align:left"><span style="font-size:12.8px"><font color="#073763"><br></font></span></div><div style="text-align:left"><span style="font-size:12.8px"><font color="#073763">I don't have any sort-ful idea of PS-C analyses.It can be TR of the chillers.</font></span></div><div style="text-align:left"><br></div><div style="text-align:left"><b style="color:rgb(102,0,0);font-size:12.8px"><br></b></div><div style="text-align:left"><b style="color:rgb(102,0,0);font-size:12.8px">Thanks,</b><br></div><div><span style="font-size:12.8px"><font color="#20124d">Sharad.</font></span></div><div><span style="font-size:12.8px"><br></span></div><div><span style="font-size:12.8px"><br></span></div><div><span style="font-size:12.8px">---------- Forwarded message ----------</span><br></div><span style="font-size:12.8px">From: Saif A via Equest-users <<a href="mailto:equest-users@lists.onebuilding.org" target="_blank">equest-users@lists.onebuildin<wbr>g.org</a>></span><br style="font-size:12.8px"><span style="font-size:12.8px">To: <a href="mailto:equest-users@lists.onebuilding.org" target="_blank">equest-users@lists.onebuil<wbr>ding.org</a></span><br style="font-size:12.8px"><span style="font-size:12.8px">Cc: </span><br style="font-size:12.8px"><span style="font-size:12.8px">Date: Mon, 15 Aug 2016 10:56:20 -0500</span><br style="font-size:12.8px"><span style="font-size:12.8px">Subject: [Equest-users] Load Reports</span><br style="font-size:12.8px"><div dir="ltr" style="font-size:12.8px">Good morning guys,<div><br></div><div>After I ran the simulation for the building I am working on I found the chiller size and plant loads does not match in  reports PS-C and PV-A the difference is almost double is that normal? Also when I try to input the chiller capacity in detailed mode the results in the reports does not change is there a way to fix this?</div><div><br></div><div>Thank you,</div><div><br></div><div>Saif</div><div><br></div></div><div class="gmail_extra"><br></div></div>