<div dir="ltr"><span style="font-size:12.8px;color:rgb(69,69,69)">Hi everyone </span><div><font color="#454545"><span style="font-size:12.8px"><br></span></font><div style="font-size:12.8px;color:rgb(69,69,69)">I am working on multifamily project where there is a single DX package unit for each floor when I assign a package for all the floor zones I have a lot of unmet hours except for the thermostat zone, but if I assign a package unit for each zone I have zero unmet hours. so I am just wondering what causing this problem?</div></div><div style="font-size:12.8px;color:rgb(69,69,69)"><br></div><div style="font-size:12.8px;color:rgb(69,69,69)">Thank you,</div><div style="font-size:12.8px;color:rgb(69,69,69)"><br></div><div style="font-size:12.8px;color:rgb(69,69,69)">Saif,</div></div>