<div dir="ltr"><div>I have a Retail Space within an existing Shopping Mall pursuing LEED CI certification. The shopping mall is served by a central plant. The retail space which is our scope of work has its own Air Handling Unit providing conditioned air. The Retail space receives unconditioned ventilation air from the base building. </div><div><br></div><div>If I follow the LEED V4 guidelines, Method 2 under the 'Contribution of the Base Building HVAC and Service Water Heating Systems', is it sufficient to model only our scope of work (Retail Space) and pro-rate the central plant capacities etc based on the area ratio of our scope versus whole building?</div><div><br></div><div>Thanks,</div><div> <br></div><div class="gmail_signature" data-smartmail="gmail_signature"><div><strong><em>Shilpa Surana</em></strong></div></div>
</div>