<div dir="ltr"><font color="#073763">Hi Darryl,</font><div><font color="#073763"><br></font></div><div><font color="#073763">I think this is some other software than equest.</font></div><div><font color="#073763">But as far as my understanding is concerned Nick is correct.</font></div><div><font color="#073763">I also think that you have assigned two three components to wall or glazing.</font></div><div><font color="#073763">The component can be the default or make of the assignments.</font></div><div><font color="#073763">The assignments can be the properties having components or assignments.</font></div><div><font color="#073763">So kindly assign or link the proper assignments to the building envelope so that the proper U valued or property having assignments can be singly linked to proper building envelope.</font></div><div><font color="#073763"><br></font></div><div><font color="#073763">For this you will have to have a look at the make or sectional drawings of building envelope and then have the make to assign it to the proper surface or building envelope. These construction can be singly linked to the envelope in equest. There can not be two building envelope assignments at one time. This is not the means.</font></div><div><font color="#073763"><br></font></div><div><b><font color="#0c343d">Thanks</font><font color="#073763">,</font></b></div><div><div style="font-size:12.8px"><p><span style="font-family:georgia,serif"><b><font color="#b45f06">Sharad.Kumar.</font></b></span><span style="font-family:georgia,serif"><font color="#660000" style="font-weight:bold"> </font><font color="#0c343d">(<a href="mailto:sharadcapricious@gmail.com" target="_blank">sharadcapricious@gmail.com</a>)</font></span></p><p><span style="font-family:georgia,serif"><font color="#783f04">B. Tech (Vellore Institute of Technology)</font></span></p><p><span style="font-family:georgia,serif"><font color="#660000">India.</font></span></p></div></div><div>.............................................................................................................</div><div>---------- Forwarded message ----------<br>From: Darryl Kasun via Equest-users <<a href="mailto:equest-users@lists.onebuilding.org" target="_blank">equest-users@lists.onebuilding.org</a>><br>To: <a href="mailto:equest-users@lists.onebuilding.org" target="_blank">equest-users@lists.onebuilding.org</a><br>Cc: <br>Date: Mon, 25 Jul 2016 13:43:23 -0700<br>Subject: Re: [Equest-users] Construction Assignment Error<br><div dir="ltr"><span style="font-size:12.8px">Hello everyone - I posted this a couple days back but didn't get a response so going to repost it!</span><div style="font-size:12.8px"><br></div><div style="font-size:12.8px">Whilst doing some quality control reporting, the following popped up:</div><div style="font-size:12.8px"><br></div><div style="font-size:12.8px"><img src="cid:ii_1560ede8ba7bf720" alt="Inline image 1" width="408" height="166"><br></div><div style="font-size:12.8px"><br></div><div style="font-size:12.8px">To put this image into words, the Quality Control Reports that many of the constructions have multiple component types assigned to them.</div><div style="font-size:12.8px"><br></div><div style="font-size:12.8px">Do you know what this possible error means?</div><div style="font-size:12.8px"><br></div><div style="font-size:12.8px">Thanks</div><div style="font-size:12.8px">Darryl Kasun</div></div><div class="gmail_extra"><br></div></div></div>