<div dir="ltr">In my experience LEED will accept a second baseline system type for the corridors, but then following appendix G, you would use a System type 7.  I would take the same interpretation for MFHR.  <div><br></div><div>You could probably make a case to do all residential systems, but with gas heating in the corridor, that would put you in a System Type 1 throughout, which would unnecessarily punish your dwelling units.</div><div><br></div><div>Cheers,</div><div>Elizabeth</div></div><div class="gmail_extra"><br clear="all"><div><div class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><b><br></b></div><div dir="ltr"><b>Elizabeth Gillmor  <font size="1">PE, BEMP, LC, LEED AP</font></b><div><br></div><div><span style="font-size:large;background-color:rgb(255,255,255)"><b><font color="#38761d" face="arial, helvetica, sans-serif">e n e r g e t i c s  </font></b></span><b><font color="#38761d" face="arial, helvetica, sans-serif" size="2">consulting engineers, llc</font></b></div><div><font size="2" style="background-color:rgb(255,255,255)" color="#666666"><a href="http://energetics-eng.com" target="_blank">energetics-eng.com</a> |</font><span style="color:rgb(102,102,102);font-size:small"> 303.619.0091</span></div></div></div></div></div></div></div></div></div></div></div></div></div>
<br><div class="gmail_quote">On Thu, Jun 9, 2016 at 1:41 PM, Sunayana Jain via Equest-users <span dir="ltr"><<a href="mailto:equest-users@lists.onebuilding.org" target="_blank">equest-users@lists.onebuilding.org</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div lang="EN-US" link="#0563C1" vlink="#954F72"><div><p class="MsoNormal">I have 10 floors multi-family building. Units are served by packaged terminal heat pumps and corridors are pressurized and are served by RTUs (MAUs) with gas heat. Units are naturally ventilated. Total corridor area is greater than 20,000 SF.</p><p class="MsoNormal"> </p><p class="MsoNormal">I wanted to know if residential systems (System 1 or System 2) should be applied for the corridors in the baseline as recommended by Multi-Family High Rise (MFHR) guideline? Would LEED also accept residential systems for corridors instead of non-residential systems?</p><p class="MsoNormal"> </p><p class="MsoNormal">I have seen this discussion in the past but was curious to know the latest take on it.</p><p class="MsoNormal"> </p><p class="MsoNormal">Thanks,</p><span class="HOEnZb"><font color="#888888"><p class="MsoNormal"> </p><p class="MsoNormal">Sunayana</p></font></span></div></div>
<br>_______________________________________________<br>
Equest-users mailing list<br>
<a href="http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org" rel="noreferrer" target="_blank">http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org</a><br>
To unsubscribe from this mailing list send  a blank message to <a href="mailto:EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG">EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG</a><br>
<br></blockquote></div><br></div>