<div dir="ltr">Hi,<div><br></div><div>One of my LEED project received a standard comment as:</div><div><br></div><div><span style="font-size:11pt;line-height:115%;font-family:'Arial Narrow',sans-serif;color:rgb(54,95,145)"><b>Energy
recovery is modeled for credit in the Proposed Case. Provide further
information regarding the energy recovery efficiency, verify that outside air
is modeled with zero flow in both the Baseline and Proposed Case during unoccupied
periods when fans are cycled on to meet unoccupied setback temperatures unless
health or safety regulations mandate an alternate minimum flow during
unoccupied periods (in which case, the unoccupied outside air rates should be
modeled identically in the Baseline and Proposed Case), and indicate the bypass
mechanism used to bypass the energy recovery during mild conditions.</b></span><br></div><div><font face="Arial Narrow, sans-serif" color="#000000"><span style="font-size:14.6667px;line-height:16.8667px">I need to know,what exactly i need to do in E-quest <a href="http://model.as">model.as</a> per my understanding,i need to Keep Fan operation on by putting the fixed set point temp. control with bypass mechanism.</span></font></div><div><font face="Arial Narrow, sans-serif" color="#000000"><span style="font-size:14.6667px;line-height:16.8667px">But how exactly it will consider schedule for unoccupied hours.And how bypass mechanism will serve the purpose during mild condition?</span></font></div><div><font face="Arial Narrow, sans-serif" color="#000000"><span style="font-size:14.6667px;line-height:16.8667px">Please guide to resolve this query.</span></font></div><div><font face="Arial Narrow, sans-serif" color="#000000"><span style="font-size:14.6667px;line-height:16.8667px"><img src="cid:ii_152b1bcd18f65e6e" alt="Inline image 1" width="456" height="253"><br></span></font></div></div>