<div>Dear equest user,</div><div><br></div><div>  I have a Leed energy modeling project,which include two buildings.And the cooling energy of the both building is supplied by the same cooling plants.However,the both buildings are applied LEED-CS certification seprately.As we all known,it can be dealed  as campus thermal energy problem.And because the the building housing the thermal energy plant is itself the LEED project building,option 2 can be used for cooling system without considering the EAC1 points restriction.Howerver the heating energy of the project is supplied by Purchased heat, <b>so</b> <b>my question is if option2 can be used for heating system where the EAc1  can not achieve 8 </b><b style="line-height: 1.5;">points</b><b style="line-height: 1.5;">.</b></div><div><b style="line-height: 1.5;"><br></b></div><div><span style="line-height: 1.5;">Any suggestion? </span></div><div>Thanks!</div><div><br></div><div><div style="color:#909090;font-family:Arial Narrow;font-size:12px">------------------</div><div style="font-size:14px;font-family:Verdana;color:#000;"><div>
<div><font color="#3366ff" size="2"><strong>Yongqing Zhao</strong></font></div>
<div><font size="2"><strong><font color="#006600">Changsha Green Building & Energy Saving Technology CO.,LTD<br></font></strong><font color="#3366ff">NO.438,Shaoshan Road,Changsha,Hunan,China<br>Telephone:13574805636</font></font></div>
<div><font color="#3366ff" size="2">Email:zhaoyongqing1987@126.com</font></div>
<div><font size="2">         <span>503271081@qq.com</span></font> </div></div></div></div><div> </div>