<div dir="ltr"><div><div><div>Hello,<br><br></div>I'm having what appears to be a minor
 issue with unmet hours in a model that I've inherited.  My INP and PD2 
files are attached.  I've tried adjusting the cool sizing ratio and and 
adjusted infiltration rates and equipment loads with no real effects.  
Anybody have any ideas?<br><br></div>Thanks,<br></div>Mike Campbell<br></div>