<div dir="ltr">Dear Equesters,<div><br></div><div><br></div><div>I have a building with 800TR load and 2 chillers of 400TR each . In actual design the chiller sequencing is in such way that</div><div><br></div><div>for 0 to 400TR chiller 1 will operate</div><div><br></div><div>for load between 400TR to 800TR  both chillers will run under 50% of total building load ie the building load is say 500TR so chillers wil operate like 250TR for each 1&2. not like 400TR for chiller 1 and 100TR for chiller 2.</div><div><br></div><div>How can i do such sequencing in equipment control.</div><div><br></div><div>I shall wait for your valuable response.</div><div><br></div><div>Regards</div><div>Sambhav Tiwari</div></div>