<div dir="ltr">Good Morning -<div><br></div><div>I am working on a 65 story building in eQuest 3.64. The building is cooled by Standard VAV units (primary cooling equipement is chillers) heated by perimeter baseboards (steam boilers). </div><div><br></div><div>The first 6 floors of the building have perimeter induction units with no re-heat. For this I have created a different loop (linked this to the primary heating loop). This loop is called the Circulation Loop 5 in my model. I assign this loop to the   baseboard loop in the air side HVAC parameters. </div><div><br></div><div>When I run the simulation I get the following error:</div><div><br></div><div><div> ***ERROR***********************************************************************</div><div>             Loop: Circulation Loop 5               has no attached primary</div><div>             heating equipment.</div><div><br></div><div>I could not find anything in the archives directly to tackle this issue. Not an expert in HVAC and hence need your advise.</div><div><br></div><div><br></div><div>snapshot of loop window:</div><div><br></div><div><img src="cid:ii_14e970ba66e8da89" alt="Inline image 1" width="506" height="316"><br></div><div><br></div><div>Thanks in advance.</div>-- <br><div class="gmail_signature"><p style="margin:0in 0in 0pt"><b><font size="3"><font color="#006600" face="Calibri">- Pranita </font></font></b></p><br></div>
</div></div>