<div style="line-height:1.7;color:#000000;font-size:14px;font-family:arial">Dear all,<div>When simulating district cooling for LEED, a virtual plant is required to be added to the proposed building, according to the "<span style="line-height: 1.7;">Treatment of District or Campus Thermal Energy in LEED </span><span style="line-height: 1.7;">V2 and LEED 2009 ¨C Design & Construction".</span></div><div>The efficiency of the virtual plant is obtained through modeling if the district cooling system is new.</div><div>The "<span style="line-height: 1.7;">Treatment of District or Campus Thermal Energy in LEED </span><span style="line-height: 1.7;">V2 and LEED 2009 ¨C Design & Construction" said, "</span>Apply measured or estimated load profiles as ˇ°process loadsˇ± to reflect the estimated total loads on the district energy plant".</div><div>My question is:</div><div>What is the estimated load? If the district cooling system provides cold to any other buildings that are not in the LEED certificate scope, how can I get the estimated load? <br><div>Regards,</div><div><span style="line-height: 1.7;">Esmi</span></div></div></div><br><br><span title="neteasefooter"><span id="netease_mail_footer"></span></span>