<div>I use the min flow schedules to be 70-100% open (depending on the control strategy) and min OA schedule to keep OA off. Cannot use the heating availability schedule since it effects the terminal units also.</div><div>
Thanks</div><div>-Rohini<br><br></div><div class="gmail_quote">On Tue, Dec 11, 2012 at 11:37 AM, Chris Jones <span dir="ltr"><<a href="mailto:cj@enersave.ca" target="_blank">cj@enersave.ca</a>></span> wrote:<br><blockquote style="margin:0px 0px 0px 0.8ex;padding-left:1ex;border-left-color:rgb(204,204,204);border-left-width:1px;border-left-style:solid" class="gmail_quote">

<div>
<font size="3">Fan schedule, minimum outdoor air schedule and possibly
minimum flow schedule in the zones.  There are also the heating and
cooling availability schedules if needed. <br><div><div class="h5"><br>
<br>
At 11:13 AM 11/12/2012, R B wrote:<br>
</div></div><blockquote type="cite"><div><div class="h5">Has anyone found a good way to
model morning warm-up in eQuest?<br>
Appreciate any suggestions. Thanks<br>
-Rohini<br></div></div>
_______________________________________________<br>
</blockquote>
<u></u><p><u></u>
>><br>
Christopher Jones, P.Eng.<br>
Suite 1801, 1 Yonge Street<br>
Toronto, ON M5E1W7<br>
Tel. <a href="tel:416-203-7465" target="_blank" value="+14162037465">416-203-7465</a><br>
Fax. <a href="tel:416-946-1005" target="_blank" value="+14169461005">416-946-1005</a><br>
email <a href="mailto:cj@enersave.ca" target="_blank">cj@enersave.ca</a><br>
</p></font></div>

</blockquote></div><br>