<p class="MsoNormal">I have a facility with three separate 3-story buildings all
connected by catwalks.  Two buildings (North and South) are on one meter
and the third building (West) is metered separately.  I want to meter the
West building separately which only has interior lighting and miscellaneous
equipment loads.  The campus cooling and heating equipment is all metered
on the North and South building meter. I know how to create separate meters,
but I don’t know how to assign them to the loads or shells.  </p>

<p class="MsoNormal"> </p>

<p class="MsoNormal">Can I have the West buildings interior loads metered
separately from the North and South building loads?</p>

<p class="MsoNormal"> </p>

<p class="MsoNormal">Thanks,</p>

<p class="MsoNormal">Randy </p>