<div>Hi All,</div><div> </div><div>I am modelling a typical office building for EPACT which has a cooking school also. It has 4 MAU's (10 HP each) and 2 exhaust fans (35 HP total). The MAU's have chilled water coil and electric heating. How would one deal with this in the baseline per APP G 2004 and ASHRAE 2001. Is this either system 4 and has heat recovery or would it be same in both baseline and actual runs? </div>
<div> </div><div>Thanks for any insights.</div><div>-Rohini</div>