<div dir="ltr"><div>Dear all,</div><div> </div><div> </div><div>I have a project where steam boilers are proposed for a laundry in a hotel, we have two options either to use electric boilers or fuel fired ones, given that the steam requirement s are low for the laundry, an electric steam boiler was recommended as it will require less space and will require less accessories, given that the building is a LEED project, when simulating this plant, shall it be considered part of the process load (i.e. it doesn't serve the domestic hot water of the building), and make it the same for both proposed and baseline buildings? or shall any variations be applied?</div>

<div> </div><div>Thanks in advance and really looking for your feed back</div><div> </div><div>Regards</div><div> </div><div>Yazan</div></div>