<html>
<body>
A quick search reveals that the State of Texas adopted the IECC 2009 code
effective April 2011.  This document may provide some directions as
to OA control.  <br>
<a href="http://www.seco.cpa.state.tx.us/tbec/comres.php" eudora="autourl">
http://www.seco.cpa.state.tx.us/tbec/comres.php<br><br>
</a>At 01:25 PM 06/06/2012, John Aulbach wrote:<br>
<blockquote type=cite class=cite cite="">Gang:<br><br>
I am trying to find where in the Texas Health and Safety Code where is
says you must OPERATE ventilation in a certain manner, not just design a
system to provide such ventilation. Tells me if i can reduce or eliminate
exhaust air during certain times of the day (eQuest EEM).<br><br>
California Title-24, Subchapter 3, Section 121.c.1 specifically
states:<br><br>
<font face="times new roman">1. Times of occupancy. The minimum rate of
outdoor air required by Section 121(b)2 shall be supplied to each<br>
space at all times when the space is usually occupied.<br>
EXCEPTION 1 to Section 121(c)1: Demand control ventilation. In
intermittently occupied spaces that do not<br>
have processes or operations that generate dusts, fumes, mists, vapors or
gasses and are not provided with local<br>
exhaust ventilation (such as indoor operation of internal combustion
engines or areas designated for unvented<br>
</font>food service preparation), the rate of outdoor air may be reduced
if the ventilation system serving the space is<br>
<font face="times new roman">controlled by a demand control ventilation
device complying with Section 121(c)4.<br>
EXCEPTION 2 to Section 121(c)1: Temporary reduction. The rate of outdoor
air provided to a space may be<br>
reduced below the level required by Section 121(b)2 for up to 5 minutes
each hour if the average rate for each<br>
hour is equal to or greater than the required ventilation rate.<br>
NOTE: VAV must comply with Section 121(c)1 at minimum supply
airflow.<br>
</font><br>
<font face="times new roman">I am trying to find a similar edict for the
State of Texas.<br><br>
Any takers?<br><br>
</font><a name="_MailAutoSig"></a>John R. Aulbach, PE, CEM<br>
Senior Energy Engineer<br>
<br>
<b>Partner Energy<br>
</b>2154 Torrance Blvd, Ste. 100, Torrance, CA 90501<br>
W: 888-826-1216, X254| D: 310-765-7295 | F: 310-817-2745<br>
<a href="http://www.ptrenergy.com/">www.ptrenergy.com</a>
<a href="mailto:|%20jaulbach@ptrenergy.com">|
jaulbach@ptrenergy.com</a><br>
<font face="times new roman"><br><br>
</font>_______________________________________________<br>
Equest-users mailing list<br>
<a href="http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org" eudora="autourl">
http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org</a>
<br>
To unsubscribe from this mailing list send  a blank message to
EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG</blockquote>
<x-sigsep><p></x-sigsep>
>><br>
Christopher Jones, P.Eng.<br>
Suite 1801, 1 Yonge Street<br>
Toronto, ON M5E1W7<br>
Tel. 416-203-7465<br>
Fax. 416-946-1005<br>
email cj@enersave.ca<br>
</body>
</html>