<div>Dear All,</div><div> </div><div>One of the LEED review comments on a university building project I'm working on suggests to verify that all systems in baseline and proposed models contain zero outside air flow when fans are cycled on to meet setback temperatures during unoccupied hours. </div>
<div> </div><div>What is the best way to go about verifying this? In the 'Hourly Report Block' options under a system, I find 'Hourly summed zone OA CFM for DCV calculation (cfm)' and 'Hourly max zone OA/total flow for DCV calculation (cfm/cf/). Is one or both of these options under an hourly report, the way to go or is there a better way of doing it?</div>
<div> </div><div>Thanks,</div><div>Ramana.</div>