<html><body><div style="color:#000; background-color:#fff; font-family:verdana, helvetica, sans-serif;font-size:10pt"><b><span style="font-weight:bold;"></span></b><div style="font-family: verdana, helvetica, sans-serif; font-size: 10pt;"><div style="font-family: times new roman, new york, times, serif; font-size: 12pt;"><div id="yiv1908685305"><div><div style="color:#000;background-color:#fff;font-family:verdana, helvetica, sans-serif;font-size:10pt;"><div><span>Dear Folks</span></div><div><br><span></span></div><div><span>I am running an multistorey two bedroom <span id="yiv1908685305misspell-1" class="yiv1908685305"><span>apartment</span></span> house, I considered two bedroom in each unit (Flat) as <span id="yiv1908685305misspell-2" class="yiv1908685305"><span>air-conditioned</span></span>, I had separated conditioned and non-conditioned into two separate zones and arrived at an overall tonnage of about 120. When i tried to check the Load unmet hours
 in the detailed report for conditioned zone it shows some x hours as unmet, then i increased the tonnage so that i can get into an stage where there will not have any unmet hours but even i increased the total tonnage the <span id="yiv1908685305misspell-3" class="yiv1908685305"><span>results</span></span> shows the same amount of unmet hours. Can any one help me out on this, I had attached the eQuest file for
 your reference. Thanks a lot in advance.</span></div><div><span><br></span></div><div><span>Regards</span></div><div><span>Ramesh BR</span> <br></div> </div></div></div></div> </div>  </div></body></html>