Run it with DHW and see what dhw load you get. The schedule for the process load is same as that for DHW. Then put in a value for the process load and play with it till you get the same value as the DHW (you can also calculate it and avoid the iteration). The ground temp does not vary much for mild locations - depending on how accurate you want to be, you can get the hourly data for the ground temp and use that to be more precise in the process load. It is basically 12 values - one for each month.<br>

<br><div class="gmail_quote">2012/3/30 Ömer Moltay <span dir="ltr"><<a href="mailto:omoltay@mimtarch.com" target="_blank">omoltay@mimtarch.com</a>></span><br><blockquote style="margin:0px 0px 0px 0.8ex;padding-left:1ex;border-left-color:rgb(204,204,204);border-left-width:1px;border-left-style:solid" class="gmail_quote">


  
    
  
  <div text="#000000" bgcolor="#FFFFFF">
    Yes, but when you specify a DWH loop, DOE calculates the DWH load by
    using mains water temperature from the weather file, etc on an
    hourly basis, right? How can I calculate the DWH load on an hourly
    basis with a HW loop? <br>
    <br>
    <br>
    but wouldn't the load be dependent on mains water temperatures that
    are variable and that DOE takes from the Weather File as ground
    temperatures when the DHW loop is specified? How can I <br>
    <br>
    3/30/2012 5:57 PM tarihinde, R B yazdı:
    <div><div><blockquote type="cite">
      <div>You could model the DHW loop as a hot water loop - and add
        process load to it which is equal to the dhw load.</div>
      <div>-Rohini<br>
        <br>
      </div>
      <div class="gmail_quote">2012/3/30 Ömer Moltay <span dir="ltr"><<a href="mailto:omoltay@mimtarch.com" target="_blank">omoltay@mimtarch.com</a>></span><br>
        <blockquote style="margin:0px 0px 0px 0.8ex;padding-left:1ex;border-left-color:rgb(204,204,204);border-left-width:1px;border-left-style:solid" class="gmail_quote">Dear All,<br>
          <br>
          A residential building has a flat station for each dwelling
          unit, where a single HW loop is branched into a secondary HW
          loop for space heating and a secondary DWH loop. We are
          thinking of creating secondary loops for each of the 90
          dwelling units, as we believe that this will result in a more
          energy efficient operation reflecting the operation principle
          of flat stations.<br>
          <br>
          Anyway, eQuest keeps telling us that the Primary of a
          secondary DHW loop has to be a DWH loop as well. How else do
          you suggest we model this case?<br>
          <br>
          Thank you,<br>
          <br>
          Omer Moltay<br>
          Mimta<br>
          _______________________________________________<br>
          Equest-users mailing list<br>
          <a href="http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org" target="_blank">http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org</a><br>
          To unsubscribe from this mailing list send  a blank message to
          <a href="mailto:EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG" target="_blank">EQUEST-USERS-UNSUBSCRIBE@ONEBUILDING.ORG</a><br>
        </blockquote>
      </div>
      <br>
    </blockquote>
    <br>
  </div></div></div>

</blockquote></div><br>