<html>
  <head>

    <meta http-equiv="content-type" content="text/html; charset=ISO-8859-1">
  </head>
  <body bgcolor="#FFFFFF" text="#000000">
    Hello Friends,<br>
    <br>
    Here is an brief below from the help menu for electric meter on a
    electric generator. Attached is the image for your reference.<br>
    I have assigned all electric submeters to this meter which clock
    energy consumption in the building.<br>
    Can anyone help me understand what will this account in the BEPU
    report.<br>
    <br>
    <br>
    <div id="d2h_breadcrumbs" class="d2h_breadcrumbs"><font
        color="#000099"><small><font face="Arial"><a
              class="d2h_breadcrumbsNormal" href="volume2dictionary.htm">Volume
              2: Dictionary</a><span
              class="d2h_breadcrumbsLinkSeparator"> > </span><a
              class="d2h_breadcrumbsNormal" href="hvaccomponents.htm">HVAC
              Components</a><span class="d2h_breadcrumbsLinkSeparator">
              > </span><a class="d2h_breadcrumbsNormal"
              href="elecgenerator.htm">ELEC-GENERATOR</a><span
              class="d2h_breadcrumbsLinkSeparator"> > </span><a
              class="d2h_breadcrumbsNormal"
              href="energyconsumptionofthegenerator.htm">Energy
              Consumption of the Generator</a></font></small></font></div>
    <b><small><font face="Arial">ELEC-METER</font></small>
    </b><br>
    <small><font face="Arial">Accepts a code-word specifying the
        electric meter the generator will supply. The electric meter
        must be of type UTILITY or ELECTRIC-SALE. A generator cannot be
        attached to a BUILDING or SUB-METER level meter. </font></small>
    <br>
    <small><font face="Arial">When this meter is of type UTILITY,<span
          style="background-color:#ff6;"> power produced by the
          generator will be consumed on-site to meet this meter's
          demands</span>. Depending on the operating mode of the
        generator(s), it might be possible for the generator(s) to
        produce more power than is demanded by this meter. In this case,
        you should also specify a SURPLUS-METER so that the power can be
        sold; otherwise the surplus power will be lost. </font></small>
    <br>
    <small><font face="Arial">When this meter is of type ELECTRIC-SALE,
        then all power produced by the generator will be sold; none will
        be consumed on-site.</font></small><br>
    <small><font face="Arial"><br>
      </font></small>Thanks in advance.<br>
    <pre class="moz-signature" cols="72">-- 
Kind Regards
Anup Rathi
Energy Analyst
Kalpakrit Sustainable Environments Pvt. Ltd.

Office Address:
72, Khirki village, Malviya Nagar,
New Delhi 110017
t: +91.11.29545120
M: +91.7428897507</pre>
  </body>
</html>