<DIV>Dear all,</DIV>
<DIV> </DIV>
<DIV>I'm trying to reduce the unmet hours in my model. The strange thing is that all zones are carefully controlled, meeting temperature requirement (checked in SS-R and SS-F report). Most of their unmet hours are zero, and few of them have some dozen of unmet hours but no more than 80. </DIV>
<DIV> </DIV>
<DIV>However, the overall unmet hours of my model is still above 1500 (Checked in report BEPS).</DIV>
<DIV> </DIV>
<DIV>Has anyone been faced with the same problem? Is there any solution?</DIV>
<DIV> </DIV>
<DIV>Thank you!</DIV>
<DIV> </DIV>
<DIV>Sherry</DIV>