<br><font size=2 face="sans-serif"><br>
Hello All,</font><font size=3> <br>
</font><font size=2 face="sans-serif"><br>
We are trying to model an office campus of around 12 buildings. The chiller
plant has around 10 chillers and boiler plant has around 4 nos. of steam
boilers. <br>
On the air side, the systems are a combination of VAV systems and FCUs
( modeled as SZRH in eQuest)        </font><font size=3>
</font><font size=2 face="sans-serif"><br>
After adding all the possible inputs, we are not able to meet the unmet
hours, mostly in heating. Any hints???</font><font size=3> <br>
</font>
<br>
<br>
<br><font size=2 face="sans-serif">Regards,<br>
<br>
Akshay Pahade<br>
Energy Solutions,<br>
CoEE, Johnson Controls,<br>
Mumbai, India.<br>
<br>
</font>