Dear All<br><br>I am working on a project in which one AHU has small load and we want to switch chilled water loop based on ON/OFF schedule.<br>In day time AHU is serving with "CHW-1 loop" and in night time it is serving with "CHW-2 loop".<br>

<br clear="all">Is it possible in eQUEST to switch chilled water loop based on schedule or using IF-THAN schedule.<br><br><br>-- <br>With Thanks and Regards,<br>Praveen K. Jain<br>Roorkee<br>