<div>I am trying to model two-pipe fan-coil units. The temperature of the loop can be adjusted with heating coming from the buildings steam boiler (through a converter) or from the chilled water loop served by chillers. The loop temps are based on OA temp and can vary between the 44F and 160 F. The chilled water loop and the HW loop serve other AHUs also beside the fan-coil units.</div>



<div> </div><div>Appreciate any ideas on modelling this in eQuest.</div><div> </div><div>If I make two two-pipe circulation loops secondary each with a primary loop that is CHW or HW, I have to make the primary loops also two-pipe, which is ok but then it gives an error of zero design flow.</div>
<div> </div>


<div>If I model the fan-coils as four-pipe and set the availability schedule for cooling and heating - I end up with many unmet hours during the changeover time.</div><div> </div><div>I could make all loops regular (not 2-pipe), but how do I get the temperature to vary between 44F and 160F?</div>
<div> </div><div>Thanks</div><div>-Rohini</div>