<html><body><div style="color:#000; background-color:#fff; font-family:arial, helvetica, sans-serif;font-size:10pt"><div>For LEED compliance under ASHRAE 90.1, are the 300 unmet hours the sum of all the unmet hours in each zone, or the peak per zone?  In other words if I have 250 unmet hours in one zone and 250 unmet hours in another zone, does this comply, or is it considered 500 unmet hours total?  By zones, I mean thermal zones served by the same air handling unit.  Thanks.<br></div><div><br></div><div>Brad Robinson</div><div><br></div></div></body></html>